The Problem
ASRS can utilise many specialist methods of repair to restore the structural integrity of failed masonry. ASRS were recommended by Helifix, then approached by BMW who required a contractor to design a specification and carry out the installation that would restore the structural integrity of the 16 masonry piers where vertical cracking had occurred due to thermal expansion. The works were carried out over weekends to enable the plant to operate as normal, without disruption.

The Solution
On completion of our survey at the plant ASRS proposed a design for the necessary remedial works required. The specification was to install 322 single bands of Helibar crack reinforcing horizontally across the cracks and to reconnect the masonry piers back to the main structure thus offering substantial resistance to further cracking.

ASRS completed the works within the time scale allowing the plant to operate without any disruption to the day to day running of the plant.

Community reactions

Karma 18.4

0 reactions

Start the discussion

Discussion

0 comments

No comments yet. Be the first to join the discussion.

Leave a Reply

Your email will not be published.