1.0 PURPOSE:
1.1 To lay down the procedure for operation of HPLC (Waters 600E connected with 2487 detector/Waters 1525 with 2487 detector) configuration.
2.0 SCOPE:
2.1 This SOP is applicable for operation of
0 reactions
PURPOSE:
1.1 To lay down the procedure for operation of metrohm – 701 KF titrino.
2.0 SCOPE:
2.1 This procedure is applicable in Quality Control department.
3.0 RESPONSIBILITY:
3.1 &nb
0 reactions
1.0 PURPOSE:
1.1 To lay down the procedure for operation of JASCO–P–1030 POLARIMETER.
2.0 SCOPE:
2.1 This procedure is applicable for Quality Control Department (Block-D).
3.0 &nbs
0 reactions
1.0 PURPOSE:
1.1 To lay down the procedure for operation of BANDELIN SONOREX – SONICATOR.
2.0 SCOPE:
2.1 This procedure is applicable in Quality Control department.
3.0 RESPONSIBILITY:
3.1 &
0 reactions
1.0 PURPOSE:
1.1 To lay down the procedure for operation of Merck Digital Burette.
2.0 SCOPE:
2.1 This procedure is applicable for Quality Control department.
3.0 RESPONSIBILITY:
3.1
0 reactions
1.0 PURPOSE:
1.1 To lay down the procedure for operation of THERMOLAB – Hot water bath.
2.0 SCOPE:
2.1 This procedure is applicable in Quality Control department.
3.0 RESPONSIBILITY:
3.1&nb
0 reactions
1.0 PURPOSE:
1.1 To lay down the procedure for operation of THERMOLAB – Muffle Furnace.
2.0 SCOPE:
2.1 This procedure is applicable for Quality Control department.
3.0 RESPONSIBILITY:
3.1&n
0 reactions
PURPOSE:
1.1 To lay down the procedure for operation of THERMOLAB – Oven.
2.0 SCOPE:
2.1 This procedure is applicable in Quality Control department.
3.0 RESPONSIBILITY:
3.1 Junior Ass
0 reactions
1.0 PURPOSE:
1.1 To lay down the procedure for operation of Metrohm 794 Basic Titrino.
2.0 SCOPE:
2.1 This procedure is applicable for Quality Control department.
3.0 RESPONSIBILITY:
3.1 &nb
0 reactions
PURPOSE:
1.1 To lay down the procedure for operation of WESTERN – COOLER.
2.0 SCOPE:
2.1 This procedure is applicable in Quality Control department.
3.0 RESPONSIBILITY:
3.1 Junior Assistant
0 reactions
1.0 PURPOSE:
1.1 To lay down the procedure for operation of AG285 – METTLER TOLEDO Analytical balance.
2.0 SCOPE:
2.1 This procedure is applicable Quality Control department.
3.0 RESPONSIBILITY:
0 reactions
1.0 PURPOSE:
1.1 To lay down the procedure for maintenance of registers in quality control department.
2.0 SCOPE:
2.1 This procedure is applicable for Quality Control Department.
3.0 RESPONSIBILITY:
0 reactions